European Projects

SP430 CNC Lathe
Project 2.2 RV03/3976 "Acquisition of New Metal Machining Technology"
Project period: 1 May 2014–31 May 2015
Following a competitive tender, the contract was awarded to KOVOSVIT MAS a.s. for the supply of an SP 430 CNC lathe.
Grant funding: 35% of eligible costs
MCV 1270 Power Milling Centre
Project 2.2 RV03/5147 "Acquisition of New Metal Machining Technology"
Project period: 17 August 2015–28 December 2015
Following a competitive tender, the contract was awarded to KOVOSVIT MAS a.s. for the supply of an MCV 1270 Power milling centre.
Grant funding: 35% of eligible costs
Energy Savings at the MB Komplex Production Facility
Project 16_061/0010997: “Energy Savings at the MB Komplex Production Facility”
Project period: 10 May 2017–30 October 2018
The project consisted of two separate measures:
Replacement with more energy-efficient technology: A newly designed laser-cutting machine with significantly lower power consumption was acquired while maintaining the existing technical capabilities. Following a competitive tender, the contract was awarded to Bystronic Czech Republic s.r.o. for the supply of a ByStar Fiber Dynamic Edition F4000.
Insulation of the production hall ceiling: The previously uninsulated ceiling was fitted with a 300 mm layer of blown-in Climaglass W thermal insulation. The insulation was installed by Stavo plus Votrubová s.r.o.
Grant funding: 40% of eligible costs
Energy Savings at MB Komplex, s.r.o.
Project CZ.01.3.10/0.0/0.0/20_370/0025296: “Energy Savings at MB Komplex, s.r.o.”
Project period: 21 February 2022–13 July 2022
The project involved replacing an outdated press brake that was energy-inefficient, costly to operate and environmentally unsustainable. It was replaced with a new-generation machine.
Following a competitive tender, the contract was awarded to Canmet s.r.o. for the supply of a SafanDarley H-Brake Ultra 320.42 Ultra CNC hydraulic press brake.
Grant funding: 40% of eligible costs
Project 2.2 RV03/3976 "Acquisition of New Metal Machining Technology"
Project period: 1 May 2014–31 May 2015
Following a competitive tender, the contract was awarded to KOVOSVIT MAS a.s. for the supply of an SP 430 CNC lathe.
Grant funding: 35% of eligible costs
MCV 1270 Power Milling Centre
Project 2.2 RV03/5147 "Acquisition of New Metal Machining Technology"
Project period: 17 August 2015–28 December 2015
Following a competitive tender, the contract was awarded to KOVOSVIT MAS a.s. for the supply of an MCV 1270 Power milling centre.
Grant funding: 35% of eligible costs
Energy Savings at the MB Komplex Production Facility
Project 16_061/0010997: “Energy Savings at the MB Komplex Production Facility”
Project period: 10 May 2017–30 October 2018
The project consisted of two separate measures:
Replacement with more energy-efficient technology: A newly designed laser-cutting machine with significantly lower power consumption was acquired while maintaining the existing technical capabilities. Following a competitive tender, the contract was awarded to Bystronic Czech Republic s.r.o. for the supply of a ByStar Fiber Dynamic Edition F4000.
Insulation of the production hall ceiling: The previously uninsulated ceiling was fitted with a 300 mm layer of blown-in Climaglass W thermal insulation. The insulation was installed by Stavo plus Votrubová s.r.o.
Grant funding: 40% of eligible costs
Energy Savings at MB Komplex, s.r.o.
Project CZ.01.3.10/0.0/0.0/20_370/0025296: “Energy Savings at MB Komplex, s.r.o.”
Project period: 21 February 2022–13 July 2022
The project involved replacing an outdated press brake that was energy-inefficient, costly to operate and environmentally unsustainable. It was replaced with a new-generation machine.
Following a competitive tender, the contract was awarded to Canmet s.r.o. for the supply of a SafanDarley H-Brake Ultra 320.42 Ultra CNC hydraulic press brake.
Grant funding: 40% of eligible costs